Image 1 of 1

05AR052318sa Jackson Int Terminal Atlanta GA Airport.tif

Add to Cart Add to Lightbox Download
Maynard H. Jackson Jr. International Terminal
In July 2003, former Atlanta mayor Shirley Franklin announced a new terminal to be named for Maynard H. Jackson, Jr.. The new international terminal has added twelve new gates able to hold wide-body jets, which can be converted to sixteen narrow-body gates, as well as new check-in desks and a baggage claim area solely for international carriers. Additionally, the international terminal has its own parking lot just for international passengers with over 1,100 spaces. Arriving international passengers whose final destination is Atlanta are able to keep possession of their luggage as they proceed to exit the airport. The new terminal is connected to Concourse E by the tram and also has ground transportation access via I-75. The new terminal was slated to open in 2006; however, time and cost overruns. Construction began in the summer of 2008. Estimates place the terminal's cost at $1.4 billion, and it opened on May 16, 2012.
Copyright
©RonSherman - All Rights Reserved
Image Size
7186x3600 / 74.0MB
www.ronsherman.com
Contained in galleries
Maynard H. Jackson Jr. International Terminal Atlanta GA
Maynard H. Jackson Jr. International Terminal<br />
In July 2003, former Atlanta mayor Shirley Franklin announced a new terminal to be named for Maynard H. Jackson, Jr.. The new international terminal has added twelve new gates able to hold wide-body jets, which can be converted to sixteen narrow-body gates, as well as new check-in desks and a baggage claim area solely for international carriers. Additionally, the international terminal has its own parking lot just for international passengers with over 1,100 spaces. Arriving international passengers whose final destination is Atlanta are able to keep possession of their luggage as they proceed to exit the airport. The new terminal is connected to Concourse E by the tram and also has ground transportation access via I-75. The new terminal was slated to open in 2006; however, time and cost overruns. Construction began in the summer of 2008. Estimates place the terminal's cost at $1.4 billion, and it opened on May 16, 2012.